Guidance graduate students at Allseas

At Allseas I was asked to guide graduate students of the TU Delft.

For the first graduate, the assignment was to investigate the possibility of a fibre rope winch for the block connection system of the Jacket Lift System.

The assignment for the other graduate was to investigate the possibilities for the offshore wind decommissioning market. The first offshore wind parks are already scheduled for decommissioning, and this needs to be done as environmentally friendly as well as economically as possible. The lift capacity of the Pioneering Spirit may be utilized to achieve both options.

LinkedIn